Ege Plaza, which is situated on Konya Road which is one of the business world centers in Ankara, consists of 33 floors in total with its garage floors. Ege Plaza is included in the project whose total construction area is 70.000 m² with its Volkswagen, Audi and Porsche showroom and service areas.
Ege Plaza is a very special office project that offers all the priorities that can be needed in business life, technical equipment and high level possibilities all together. In addition to original architectural design, smart building design elements climate control systems, safety and automation systems and technological structure are leading elements of this project. Apart from general cleaning, consultancy and valet services to be provided by Ege Plaza management for the flat owners, services such as secretariat, office cleaning, technical team, meeting room, renting car and airport transfer are provided against a price for the office owners. “Ege Plaza is considered as right choice, good investment” with its quality equipment, central location and rent income of 2,5-3 times according to residence having same value.
Life began in Ege Plaza where more than 95% of the offices were sold.
• High-speed 7 elevators in total, 5 emergency elevators of 5 people, 1 emergency elevator with stretcher capability of 17 people and 1 emergency elevator of 18 people
• Elevator traffic calculation in ‘Very Good‘ category
• Optional inter-office toilet and kitchen infrastructure apart from common toilets for each floor
• 100% fresh air fed ventilation system
• Balcony exits
• Electronically-controlled Transom Window Opening System
• Heat recovery ventilation
• Heating and cooling via new generation water source heat recovery VRF systems
• Independent fire water tank of 220 tons
• Emergency lightning system
• Energy-saving dim lighting automation
• Reporting System; electricity, water, visitor, service and periodical maintenance, water tank level following and reporting systems
• Photocell controlled lavatory combination faucet
• Telecom Satellite Installation and fiber internet infrastructure
• General sound recording, music and Central Announcement Systems
• 100% supplied generator installation
• Uninterrupted Power Supply (UPS) Installation
• Smart Building Control System that feels fire information and activates safety scenarios
• Led exterior lighting
• New generation sun controlled securit external wall glasses
• External wall cleaning crane
• Parking lot area of 1 vehicle for each net 40 m2 area
• Cell phone access in garage and basement floors
• CO Detection System in parking lots
• Jet Fan Smoke Removal System in the parking lots
• Barrier and radar controlled Automatic Pass System.